Skip to main content

Internal Lab Calibrations

The included default layout has event configurations for completing calibrations through a lab pathway, beginning with a Receive In Lab event. The process moves all items to In Lab before they can be calibrated or repaired.

In cases of failure, an out-of-the-box bolt-on process can be turned on. It moves the failure to Await OOT Review, where a lab manager can review the failure before sending it to Await Q.A..

After the Q.A. event, items are determined to either move back to production or be removed from service. A Return Equipment event tracks items as they leave the calibration laboratory.

Internal lab calibration workflow

Internal lab calibration workflow